Back to the Budget module

Budget lines

The budget and costs for each line are shown below.

Budget 26-0030 : Blackbird Hill Inn inc.

01 11 00 - Scope of work and general conditions

Summary

Revised budget ($)
$18,600
Actual cost ($)
$7,080
Available ($)
$11,520
Variance ($)
-$11,520
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$18,600
Extras ($)
$0
Revised budget ($)
$18,600
Estimate package
01 11 00 - Scope of work and general conditions

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$2,400
Labour ($)
$4,680
Materials ($)
$0
Actual cost ($)
$7,080
Variance (%)
-61.9 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

1 item $2,400
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021018 September 2026$2,400No file

Site hours

9 items $4,680
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberScope of work and general conditionsApproved8 h$520
Jean Tremblay - 7 SeptemberScope of work and general conditionsApproved8 h$520
Pierre Bouchard - 7 SeptemberScope of work and general conditionsApproved8 h$520
Marc Lavoie - 8 SeptemberScope of work and general conditionsApproved8 h$520
Jean Tremblay - 8 SeptemberScope of work and general conditionsApproved8 h$520
Pierre Bouchard - 8 SeptemberScope of work and general conditionsApproved8 h$520
Marc Lavoie - 9 SeptemberScope of work and general conditionsApproved8 h$520
Jean Tremblay - 9 SeptemberScope of work and general conditionsApproved8 h$520
Pierre Bouchard - 9 SeptemberScope of work and general conditionsApproved8 h$520

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 21 00 - Allowances

Summary

Revised budget ($)
$4,500
Actual cost ($)
$0
Available ($)
$4,500
Variance ($)
-$4,500
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,500
Extras ($)
$0
Revised budget ($)
$4,500
Estimate package
01 21 00 - Allowances

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-100.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 31 19 - Site meetings

Summary

Revised budget ($)
$2,200
Actual cost ($)
$1,260
Available ($)
$940
Variance ($)
-$940
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,200
Extras ($)
$0
Revised budget ($)
$2,200
Estimate package
01 31 19 - Site meetings

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$1,260
Materials ($)
$0
Actual cost ($)
$1,260
Variance (%)
-42.7 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

3 items $1,260
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberSite meetingsApproved8 h$520
Jean Tremblay - 7 SeptemberSite meetingsApproved8 h$520
Pierre Bouchard - 7 SeptemberSite meetingsApproved3,385 h$220

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 35 29 - Health and safety (CNESST, prevention plan)

Summary

Revised budget ($)
$3,100
Actual cost ($)
$2,180
Available ($)
$920
Variance ($)
-$920
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,100
Extras ($)
$0
Revised budget ($)
$3,100
Estimate package
01 35 29 - Health and safety (CNESST, prevention plan)

Cost code totals

Confirmed POs ($)
$1,240
Invoiced ($)
$1,240
Labour ($)
$760
Materials ($)
$180
Actual cost ($)
$2,180
Variance (%)
-29.7 %

Purchase orders

1 item $1,240
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0113 : Mont-Castor Equipment RentalsConfirmed$1,240$1,24018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Health and safety (CNESST, prevention plan)1lump sum$1,240$1,240

Supplier invoices

1 item $1,240
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021318 September 2026$1,240No file

Site hours

2 items $760
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberHealth and safety (CNESST, prevention plan)Approved8 h$520
Jean Tremblay - 7 SeptemberHealth and safety (CNESST, prevention plan)Approved3,692 h$240

Materials

1 item $180
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Health and safety (CNESST, prevention plan)1lot$180$180

Budget 26-0030 : Blackbird Hill Inn inc.

01 41 00 - Permits, inspections and regulatory requirements

Summary

Revised budget ($)
$2,400
Actual cost ($)
$2,150
Available ($)
$250
Variance ($)
-$250
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,400
Extras ($)
$0
Revised budget ($)
$2,400
Estimate package
01 41 00 - Permits, inspections and regulatory requirements

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$2,150
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,150
Variance (%)
-10.4 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

1 item $2,150
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021418 September 2026$2,150No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 45 00 - Quality control and testing

Summary

Revised budget ($)
$1,800
Actual cost ($)
$850
Available ($)
$75
Variance ($)
-$75
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$1,800
Extras ($)
$0
Revised budget ($)
$1,800
Estimate package
01 45 00 - Quality control and testing

Cost code totals

Confirmed POs ($)
$1,725
Invoiced ($)
$850
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$850
Variance (%)
-4.2 %

Purchase orders

1 item $1,725
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0115 : Mont-Castor Equipment RentalsConfirmed$1,725$85018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Quality control and testing1lump sum$1,725$1,725

Supplier invoices

1 item $850
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021518 September 2026$850No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 51 00 - Temporary services (power, water, site heating)

Summary

Revised budget ($)
$4,200
Actual cost ($)
$2,470
Available ($)
$400
Variance ($)
-$400
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,200
Extras ($)
$0
Revised budget ($)
$4,200
Estimate package
01 51 00 - Temporary services (power, water, site heating)

Cost code totals

Confirmed POs ($)
$3,800
Invoiced ($)
$2,470
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,470
Variance (%)
-9.5 %

Purchase orders

1 item $3,800
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0116 : Mont-Castor Equipment RentalsConfirmed$3,800$2,47018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Temporary services (power, water, site heating)1lump sum$3,800$3,800

Supplier invoices

1 item $2,470
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021618 September 2026$2,470No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 52 00 - Site facilities (trailer, toilets, container)

Summary

Revised budget ($)
$9,800
Actual cost ($)
$7,130
Available ($)
$1,480
Variance ($)
-$1,480
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$9,800
Extras ($)
$0
Revised budget ($)
$9,800
Estimate package
01 52 00 - Site facilities (trailer, toilets, container)

Cost code totals

Confirmed POs ($)
$6,400
Invoiced ($)
$5,210
Labour ($)
$1,920
Materials ($)
$0
Actual cost ($)
$7,130
Variance (%)
-15.1 %

Purchase orders

1 item $6,400
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0117 : Mont-Castor Equipment RentalsConfirmed$6,400$5,21018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Site facilities (trailer, toilets, container)1lump sum$6,400$6,400

Supplier invoices

1 item $5,210
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021718 September 2026$5,210No file

Site hours

4 items $1,920
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberSite facilities (trailer, toilets, container)Approved8 h$520
Jean Tremblay - 7 SeptemberSite facilities (trailer, toilets, container)Approved8 h$520
Pierre Bouchard - 7 SeptemberSite facilities (trailer, toilets, container)Approved8 h$520
Marc Lavoie - 8 SeptemberSite facilities (trailer, toilets, container)Approved5,538 h$360

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 56 00 - Temporary fences, barriers and protection

Summary

Revised budget ($)
$2,600
Actual cost ($)
$2,330
Available ($)
$270
Variance ($)
-$270
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,600
Extras ($)
$0
Revised budget ($)
$2,600
Estimate package
01 56 00 - Temporary fences, barriers and protection

Cost code totals

Confirmed POs ($)
$1,450
Invoiced ($)
$1,450
Labour ($)
$520
Materials ($)
$360
Actual cost ($)
$2,330
Variance (%)
-10.4 %

Purchase orders

1 item $1,450
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0118 : Mont-Castor Equipment RentalsConfirmed$1,450$1,45018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Temporary fences, barriers and protection1lump sum$1,450$1,450

Supplier invoices

1 item $1,450
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-021818 September 2026$1,450No file

Site hours

1 item $520
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberTemporary fences, barriers and protectionApproved8 h$520

Materials

1 item $360
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Temporary fences, barriers and protection1lot$360$360

Budget 26-0030 : Blackbird Hill Inn inc.

01 74 13 - Ongoing site cleanup

Summary

Revised budget ($)
$4,300
Actual cost ($)
$3,240
Available ($)
$1,060
Variance ($)
-$1,060
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,300
Extras ($)
$0
Revised budget ($)
$4,300
Estimate package
01 74 13 - Ongoing site cleanup

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$3,120
Materials ($)
$120
Actual cost ($)
$3,240
Variance (%)
-24.7 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

6 items $3,120
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberOngoing site cleanupApproved8 h$520
Jean Tremblay - 7 SeptemberOngoing site cleanupApproved8 h$520
Pierre Bouchard - 7 SeptemberOngoing site cleanupApproved8 h$520
Marc Lavoie - 8 SeptemberOngoing site cleanupApproved8 h$520
Jean Tremblay - 8 SeptemberOngoing site cleanupApproved8 h$520
Pierre Bouchard - 8 SeptemberOngoing site cleanupApproved8 h$520

Materials

1 item $120
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Ongoing site cleanup1lot$120$120

Budget 26-0030 : Blackbird Hill Inn inc.

01 74 19 - Waste management and containers

Summary

Revised budget ($)
$3,900
Actual cost ($)
$2,400
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,900
Extras ($)
$0
Revised budget ($)
$3,900
Estimate package
01 74 19 - Waste management and containers

Cost code totals

Confirmed POs ($)
$3,550
Invoiced ($)
$2,400
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,400
Variance (%)
-9.0 %

Purchase orders

1 item $3,550
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0120 : Mont-Castor Equipment RentalsConfirmed$3,550$2,40018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Waste management and containers1lump sum$3,550$3,550

Supplier invoices

1 item $2,400
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Mont-Castor Equipment RentalsApproved2026-022018 September 2026$2,400No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 74 23 - Cleanup final

Summary

Revised budget ($)
$2,600
Actual cost ($)
$0
Available ($)
$2,600
Variance ($)
-$2,600
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,600
Extras ($)
$0
Revised budget ($)
$2,600
Estimate package
01 74 23 - Cleanup final

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-100.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

01 77 00 - Fermeture de contrat et liste de deficiencies

Summary

Revised budget ($)
$1,500
Actual cost ($)
$0
Available ($)
$1,500
Variance ($)
-$1,500
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$1,500
Extras ($)
$0
Revised budget ($)
$1,500
Estimate package
01 77 00 - Fermeture de contrat et liste de deficiencies

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-100.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

02 21 13 - Topographic survey and location certificate

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
02 21 13 - Topographic survey and location certificate

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

02 41 19.13 - Selective demolition

Summary

Revised budget ($)
$26,600
Actual cost ($)
$25,390
Available ($)
$1,210
Variance ($)
-$1,210
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$18,500
Extras ($)
$8,100
Revised budget ($)
$26,600
Estimate package
02 41 19.13 - Selective demolition

Cost code totals

Confirmed POs ($)
$21,750
Invoiced ($)
$21,750
Labour ($)
$3,640
Materials ($)
$0
Actual cost ($)
$25,390
Variance (%)
-4.5 %

Purchase orders

1 item $21,750
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0124 : Lebrun DemolitionConfirmed$21,750$21,75018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Selective demolition1lump sum$21,750$21,750

Supplier invoices

1 item $21,750
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Lebrun DemolitionApproved2026-022418 September 2026$21,750No file

Site hours

7 items $3,640
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberSelective demolitionApproved8 h$520
Jean Tremblay - 7 SeptemberSelective demolitionApproved8 h$520
Pierre Bouchard - 7 SeptemberSelective demolitionApproved8 h$520
Marc Lavoie - 8 SeptemberSelective demolitionApproved8 h$520
Jean Tremblay - 8 SeptemberSelective demolitionApproved8 h$520
Pierre Bouchard - 8 SeptemberSelective demolitionApproved8 h$520
Marc Lavoie - 9 SeptemberSelective demolitionApproved8 h$520

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

02 82 13 - Asbestos removal

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
02 82 13 - Asbestos removal

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

03 01 30 - Existing foundation repair and waterproofing

Summary

Revised budget ($)
$5,800
Actual cost ($)
$5,450
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$5,800
Extras ($)
$0
Revised budget ($)
$5,800
Estimate package
03 01 30 - Existing foundation repair and waterproofing

Cost code totals

Confirmed POs ($)
$5,450
Invoiced ($)
$5,450
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$5,450
Variance (%)
-6.0 %

Purchase orders

1 item $5,450
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0126 : Nordic ConcreteConfirmed$5,450$5,45018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Existing foundation repair and waterproofing1lump sum$5,450$5,450

Supplier invoices

1 item $5,450
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Nordic ConcreteApproved2026-022618 September 2026$5,450No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

03 11 13 - Foundation formwork (footings and walls)

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
03 11 13 - Foundation formwork (footings and walls)

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

03 21 00 - Steel reinforcement

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
03 21 00 - Steel reinforcement

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

03 30 00 - Foundation concrete (footings, walls, column bases)

Summary

Revised budget ($)
$18,200
Actual cost ($)
$17,800
Available ($)
$400
Variance ($)
-$400
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$18,200
Extras ($)
$0
Revised budget ($)
$18,200
Estimate package
03 30 00 - Foundation concrete (footings, walls, column bases)

Cost code totals

Confirmed POs ($)
$15,800
Invoiced ($)
$15,800
Labour ($)
$1,740
Materials ($)
$260
Actual cost ($)
$17,800
Variance (%)
-2.2 %

Purchase orders

1 item $15,800
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0129 : Nordic ConcreteConfirmed$15,800$15,80018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Foundation concrete (footings, walls, column bases)1lump sum$15,800$15,800

Supplier invoices

1 item $15,800
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Nordic ConcreteApproved2026-022918 September 2026$15,800No file

Site hours

4 items $1,740
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberFoundation concrete (footings, walls, column bases)Approved8 h$520
Jean Tremblay - 7 SeptemberFoundation concrete (footings, walls, column bases)Approved8 h$520
Pierre Bouchard - 7 SeptemberFoundation concrete (footings, walls, column bases)Approved8 h$520
Marc Lavoie - 8 SeptemberFoundation concrete (footings, walls, column bases)Approved2,769 h$180

Materials

1 item $260
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Foundation concrete (footings, walls, column bases)1lot$260$260

Budget 26-0030 : Blackbird Hill Inn inc.

03 30 53 - Basement slab and garage slab

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
03 30 53 - Basement slab and garage slab

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

04 01 20 - Existing masonry repairs and repointing

Summary

Revised budget ($)
$3,200
Actual cost ($)
$2,980
Available ($)
$220
Variance ($)
-$220
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,200
Extras ($)
$0
Revised budget ($)
$3,200
Estimate package
04 01 20 - Existing masonry repairs and repointing

Cost code totals

Confirmed POs ($)
$2,980
Invoiced ($)
$2,980
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,980
Variance (%)
-6.9 %

Purchase orders

1 item $2,980
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0131 : Laurentian MasonryConfirmed$2,980$2,98018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Existing masonry repairs and repointing1lump sum$2,980$2,980

Supplier invoices

1 item $2,980
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian MasonryApproved2026-023118 September 2026$2,980No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

04 21 13 - Clay brick veneer

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
04 21 13 - Clay brick veneer

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

05 12 00 - Structural steel (beams, columns, lintels)

Summary

Revised budget ($)
$9,900
Actual cost ($)
$10,120
Available ($)
-$220
Variance ($)
$220
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$9,900
Extras ($)
$0
Revised budget ($)
$9,900
Estimate package
05 12 00 - Structural steel (beams, columns, lintels)

Cost code totals

Confirmed POs ($)
$9,700
Invoiced ($)
$9,700
Labour ($)
$420
Materials ($)
$0
Actual cost ($)
$10,120
Variance (%)
+2.2 %

Purchase orders

1 item $9,700
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0133 : Laurentian Steel StructuresConfirmed$9,700$9,70018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Structural steel (beams, columns, lintels)1lump sum$9,700$9,700

Supplier invoices

1 item $9,700
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian Steel StructuresApproved2026-023318 September 2026$9,700No file

Site hours

1 item $420
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberStructural steel (beams, columns, lintels)Approved6,462 h$420

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

05 50 00 - Miscellaneous metalwork (supports, angles, anchors)

Summary

Revised budget ($)
$1,800
Actual cost ($)
$1,590
Available ($)
$210
Variance ($)
-$210
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$1,800
Extras ($)
$0
Revised budget ($)
$1,800
Estimate package
05 50 00 - Miscellaneous metalwork (supports, angles, anchors)

Cost code totals

Confirmed POs ($)
$1,480
Invoiced ($)
$1,480
Labour ($)
$0
Materials ($)
$110
Actual cost ($)
$1,590
Variance (%)
-11.7 %

Purchase orders

1 item $1,480
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0134 : Laurentian Steel StructuresConfirmed$1,480$1,48018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Miscellaneous metalwork (supports, angles, anchors)1lump sum$1,480$1,480

Supplier invoices

1 item $1,480
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian Steel StructuresApproved2026-023418 September 2026$1,480No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

1 item $110
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Miscellaneous metalwork (supports, angles, anchors)1lot$110$110

Budget 26-0030 : Blackbird Hill Inn inc.

05 52 13 - Metal railings (aluminum, glass)

Summary

Revised budget ($)
$4,250
Actual cost ($)
$2,050
Available ($)
$150
Variance ($)
-$150
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,250
Extras ($)
$0
Revised budget ($)
$4,250
Estimate package
05 52 13 - Metal railings (aluminum, glass)

Cost code totals

Confirmed POs ($)
$4,100
Invoiced ($)
$2,050
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,050
Variance (%)
-3.5 %

Purchase orders

1 item $4,100
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0135 : Laurentian Steel StructuresConfirmed$4,100$2,05018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Metal railings (aluminum, glass)1lump sum$4,100$4,100

Supplier invoices

1 item $2,050
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian Steel StructuresApproved2026-023518 September 2026$2,050No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

06 10 00 - Wood framing

Summary

Revised budget ($)
$88,700
Actual cost ($)
$103,880
Available ($)
-$15,180
Variance ($)
$15,180
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
$84,150
Internal estimate ($)
Budget ($)
$88,700
Extras ($)
$0
Revised budget ($)
$88,700
Estimate package
06 10 00 - Wood framing

Cost code totals

Confirmed POs ($)
$84,150
Invoiced ($)
$91,400
Labour ($)
$12,480
Materials ($)
$0
Actual cost ($)
$103,880
Variance (%)
+17.1 %

Purchase orders

1 item $84,150
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0071 : Rivard FramingConfirmed$84,150$91,40018 Aug. 2026No file
3 subitems
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Wall framing1lump sum$33,000$33,000
Floor framing1lump sum$28,650$28,650
Roof framing1lump sum$22,500$22,500

Supplier invoices

2 items $91,400
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Rivard FramingApprovedCR-2608131 Aug. 2026$79,600No file
Rivard FramingApprovedCR-2609218 September 2026$11,800No file

Site hours

24 items $12,480
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberWood framingApproved8 h$520
Jean Tremblay - 7 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 7 SeptemberWood framingApproved8 h$520
Marc Lavoie - 8 SeptemberWood framingApproved8 h$520
Jean Tremblay - 8 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 8 SeptemberWood framingApproved8 h$520
Marc Lavoie - 9 SeptemberWood framingApproved8 h$520
Jean Tremblay - 9 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 9 SeptemberWood framingApproved8 h$520
Marc Lavoie - 10 SeptemberWood framingApproved8 h$520
Jean Tremblay - 10 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 10 SeptemberWood framingApproved8 h$520
Marc Lavoie - 11 SeptemberWood framingApproved8 h$520
Jean Tremblay - 11 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 11 SeptemberWood framingApproved8 h$520
Marc Lavoie - 12 SeptemberWood framingApproved8 h$520
Jean Tremblay - 12 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 12 SeptemberWood framingApproved8 h$520
Marc Lavoie - 13 SeptemberWood framingApproved8 h$520
Jean Tremblay - 13 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 13 SeptemberWood framingApproved8 h$520
Marc Lavoie - 14 SeptemberWood framingApproved8 h$520
Jean Tremblay - 14 SeptemberWood framingApproved8 h$520
Pierre Bouchard - 14 SeptemberWood framingApproved8 h$520

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

06 17 33 - Prefabricated floor joists

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
06 17 33 - Prefabricated floor joists

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

06 17 53 - Prefabricated roof trusses

Summary

Revised budget ($)
$0
Actual cost ($)
$0
Available ($)
$0
Variance ($)
$0
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$0
Extras ($)
$0
Revised budget ($)
$0
Estimate package
06 17 53 - Prefabricated roof trusses

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
0.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

06 20 00 - Finish carpentry (mouldings, baseboards, trim)

Summary

Revised budget ($)
$9,200
Actual cost ($)
$2,360
Available ($)
$6,040
Variance ($)
-$6,040
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$9,200
Extras ($)
$0
Revised budget ($)
$9,200
Estimate package
06 20 00 - Finish carpentry (mouldings, baseboards, trim)

Cost code totals

Confirmed POs ($)
$1,600
Invoiced ($)
$800
Labour ($)
$1,320
Materials ($)
$240
Actual cost ($)
$2,360
Variance (%)
-65.7 %

Purchase orders

1 item $1,600
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0139 : Rivard FramingConfirmed$1,600$80018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Finish carpentry (mouldings, baseboards, trim)1lump sum$1,600$1,600

Supplier invoices

1 item $800
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Rivard FramingApproved2026-023918 September 2026$800No file

Site hours

3 items $1,320
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberFinish carpentry (mouldings, baseboards, trim)Approved8 h$520
Jean Tremblay - 7 SeptemberFinish carpentry (mouldings, baseboards, trim)Approved8 h$520
Pierre Bouchard - 7 SeptemberFinish carpentry (mouldings, baseboards, trim)Approved4,308 h$280

Materials

1 item $240
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Finish carpentry (mouldings, baseboards, trim)1lot$240$240

Budget 26-0030 : Blackbird Hill Inn inc.

06 41 00 - Kitchen and bathroom cabinets

Summary

Revised budget ($)
$15,800
Actual cost ($)
$4,605
Available ($)
$450
Variance ($)
-$450
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$15,800
Extras ($)
$0
Revised budget ($)
$15,800
Estimate package
06 41 00 - Kitchen and bathroom cabinets

Cost code totals

Confirmed POs ($)
$15,350
Invoiced ($)
$4,605
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$4,605
Variance (%)
-2.8 %

Purchase orders

1 item $15,350
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0140 : Rivard FramingConfirmed$15,350$4,60518 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Kitchen and bathroom cabinets1lump sum$15,350$15,350

Supplier invoices

1 item $4,605
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Rivard FramingApproved2026-024018 September 2026$4,605No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

07 10 00 - Drainage membrane (Delta-MS) and foundation protection

Summary

Revised budget ($)
$2,600
Actual cost ($)
$2,340
Available ($)
$260
Variance ($)
-$260
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,600
Extras ($)
$0
Revised budget ($)
$2,600
Estimate package
07 10 00 - Drainage membrane (Delta-MS) and foundation protection

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$1,120
Labour ($)
$1,040
Materials ($)
$180
Actual cost ($)
$2,340
Variance (%)
-10.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

1 item $1,120
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024118 September 2026$1,120No file

Site hours

2 items $1,040
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberDrainage membrane (Delta-MS) and foundation protectionApproved8 h$520
Jean Tremblay - 7 SeptemberDrainage membrane (Delta-MS) and foundation protectionApproved8 h$520

Materials

1 item $180
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Drainage membrane (Delta-MS) and foundation protection1lot$180$180

Budget 26-0030 : Blackbird Hill Inn inc.

07 21 13 - Rigid insulation (foundations, walls, under slab)

Summary

Revised budget ($)
$3,100
Actual cost ($)
$2,860
Available ($)
$240
Variance ($)
-$240
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,100
Extras ($)
$0
Revised budget ($)
$3,100
Estimate package
07 21 13 - Rigid insulation (foundations, walls, under slab)

Cost code totals

Confirmed POs ($)
$2,450
Invoiced ($)
$2,450
Labour ($)
$260
Materials ($)
$150
Actual cost ($)
$2,860
Variance (%)
-7.7 %

Purchase orders

1 item $2,450
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0142 : Beaulac Building Supplies inc.Confirmed$2,450$2,45018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Rigid insulation (foundations, walls, under slab)1lump sum$2,450$2,450

Supplier invoices

1 item $2,450
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024218 September 2026$2,450No file

Site hours

1 item $260
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberRigid insulation (foundations, walls, under slab)Approved4 h$260

Materials

1 item $150
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Rigid insulation (foundations, walls, under slab)1lot$150$150

Budget 26-0030 : Blackbird Hill Inn inc.

07 21 16 - Batt insulation (fibreglass, mineral wool)

Summary

Revised budget ($)
$6,200
Actual cost ($)
$4,520
Available ($)
$630
Variance ($)
-$630
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$6,200
Extras ($)
$0
Revised budget ($)
$6,200
Estimate package
07 21 16 - Batt insulation (fibreglass, mineral wool)

Cost code totals

Confirmed POs ($)
$4,250
Invoiced ($)
$3,200
Labour ($)
$1,040
Materials ($)
$280
Actual cost ($)
$4,520
Variance (%)
-10.2 %

Purchase orders

1 item $4,250
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0143 : Beaulac Building Supplies inc.Confirmed$4,250$3,20018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Batt insulation (fibreglass, mineral wool)1lump sum$4,250$4,250

Supplier invoices

1 item $3,200
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024318 September 2026$3,200No file

Site hours

2 items $1,040
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberBatt insulation (fibreglass, mineral wool)Approved8 h$520
Jean Tremblay - 7 SeptemberBatt insulation (fibreglass, mineral wool)Approved8 h$520

Materials

1 item $280
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Batt insulation (fibreglass, mineral wool)1lot$280$280

Budget 26-0030 : Blackbird Hill Inn inc.

07 21 23 - Blown insulation (attic)

Summary

Revised budget ($)
$3,600
Actual cost ($)
$0
Available ($)
$120
Variance ($)
-$120
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,600
Extras ($)
$0
Revised budget ($)
$3,600
Estimate package
07 21 23 - Blown insulation (attic)

Cost code totals

Confirmed POs ($)
$3,480
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-3.3 %

Purchase orders

1 item $3,480
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0144 : Beaulac Building Supplies inc.Confirmed$3,480$018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Blown insulation (attic)1lump sum$3,480$3,480

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

07 25 00 - Air and weather barriers (Tyvek, Typar)

Summary

Revised budget ($)
$2,850
Actual cost ($)
$2,520
Available ($)
$330
Variance ($)
-$330
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,850
Extras ($)
$0
Revised budget ($)
$2,850
Estimate package
07 25 00 - Air and weather barriers (Tyvek, Typar)

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$1,160
Labour ($)
$1,040
Materials ($)
$320
Actual cost ($)
$2,520
Variance (%)
-11.6 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

1 item $1,160
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024518 September 2026$1,160No file

Site hours

2 items $1,040
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberAir and weather barriers (Tyvek, Typar)Approved8 h$520
Jean Tremblay - 7 SeptemberAir and weather barriers (Tyvek, Typar)Approved8 h$520

Materials

1 item $320
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Air and weather barriers (Tyvek, Typar)1lot$320$320

Budget 26-0030 : Blackbird Hill Inn inc.

07 26 00 - Vapour barrier

Summary

Revised budget ($)
$1,500
Actual cost ($)
$1,150
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$1,500
Extras ($)
$0
Revised budget ($)
$1,500
Estimate package
07 26 00 - Vapour barrier

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$340
Labour ($)
$650
Materials ($)
$160
Actual cost ($)
$1,150
Variance (%)
-23.3 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

1 item $340
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024618 September 2026$340No file

Site hours

2 items $650
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberVapour barrierApproved8 h$520
Jean Tremblay - 7 SeptemberVapour barrierApproved2 h$130

Materials

1 item $160
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Vapour barrier1lot$160$160

Budget 26-0030 : Blackbird Hill Inn inc.

07 31 13 - Asphalt shingle roofing

Summary

Revised budget ($)
$18,500
Actual cost ($)
$17,850
Available ($)
$650
Variance ($)
-$650
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$18,500
Extras ($)
$0
Revised budget ($)
$18,500
Estimate package
07 31 13 - Asphalt shingle roofing

Cost code totals

Confirmed POs ($)
$17,850
Invoiced ($)
$17,850
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$17,850
Variance (%)
-3.5 %

Purchase orders

1 item $17,850
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0147 : Beaulac Building Supplies inc.Confirmed$17,850$17,85018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Asphalt shingle roofing1lump sum$17,850$17,850

Supplier invoices

1 item $17,850
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024718 September 2026$17,850No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

07 46 46 - Fibre cement siding (James Hardie)

Summary

Revised budget ($)
$12,750
Actual cost ($)
$6,200
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$12,750
Extras ($)
$0
Revised budget ($)
$12,750
Estimate package
07 46 46 - Fibre cement siding (James Hardie)

Cost code totals

Confirmed POs ($)
$12,400
Invoiced ($)
$6,200
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$6,200
Variance (%)
-2.7 %

Purchase orders

1 item $12,400
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0148 : Beaulac Building Supplies inc.Confirmed$12,400$6,20018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Fibre cement siding (James Hardie)1lump sum$12,400$12,400

Supplier invoices

1 item $6,200
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024818 September 2026$6,200No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

07 62 00 - Flashing and sheet metal

Summary

Revised budget ($)
$4,600
Actual cost ($)
$2,225
Available ($)
$150
Variance ($)
-$150
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,600
Extras ($)
$0
Revised budget ($)
$4,600
Estimate package
07 62 00 - Flashing and sheet metal

Cost code totals

Confirmed POs ($)
$4,450
Invoiced ($)
$2,225
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,225
Variance (%)
-3.3 %

Purchase orders

1 item $4,450
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0149 : Beaulac Building Supplies inc.Confirmed$4,450$2,22518 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Flashing and sheet metal1lump sum$4,450$4,450

Supplier invoices

1 item $2,225
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Beaulac Building Supplies inc.Approved2026-024918 September 2026$2,225No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

07 92 00 - Caulking and sealants

Summary

Revised budget ($)
$2,800
Actual cost ($)
$0
Available ($)
$1,050
Variance ($)
-$1,050
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,800
Extras ($)
$0
Revised budget ($)
$2,800
Estimate package
07 92 00 - Caulking and sealants

Cost code totals

Confirmed POs ($)
$1,750
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-37.5 %

Purchase orders

1 item $1,750
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0150 : Beaulac Building Supplies inc.Confirmed$1,750$018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Caulking and sealants1lump sum$1,750$1,750

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

08 11 13 - Steel doors and frames (exterior, interior garage)

Summary

Revised budget ($)
$3,800
Actual cost ($)
$1,840
Available ($)
$120
Variance ($)
-$120
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,800
Extras ($)
$0
Revised budget ($)
$3,800
Estimate package
08 11 13 - Steel doors and frames (exterior, interior garage)

Cost code totals

Confirmed POs ($)
$3,680
Invoiced ($)
$1,840
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$1,840
Variance (%)
-3.2 %

Purchase orders

1 item $3,680
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0151 : Boisvert Windows inc.Confirmed$3,680$1,84018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Steel doors and frames (exterior, interior garage)1lump sum$3,680$3,680

Supplier invoices

1 item $1,840
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Boisvert Windows inc.Approved2026-025118 September 2026$1,840No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

08 14 16 - Interior doors (MDF, wood, hollow or solid core)

Summary

Revised budget ($)
$4,200
Actual cost ($)
$0
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,200
Extras ($)
$0
Revised budget ($)
$4,200
Estimate package
08 14 16 - Interior doors (MDF, wood, hollow or solid core)

Cost code totals

Confirmed POs ($)
$3,850
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-8.3 %

Purchase orders

1 item $3,850
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0152 : Boisvert Windows inc.Confirmed$3,850$018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Interior doors (MDF, wood, hollow or solid core)1lump sum$3,850$3,850

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

08 53 13 - PVC windows

Summary

Revised budget ($)
$46,900
Actual cost ($)
$22,600
Available ($)
$1,700
Variance ($)
-$1,700
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$46,900
Extras ($)
$0
Revised budget ($)
$46,900
Estimate package
08 53 13 - PVC windows

Cost code totals

Confirmed POs ($)
$45,200
Invoiced ($)
$22,600
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$22,600
Variance (%)
-3.6 %

Purchase orders

1 item $45,200
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0153 : Boisvert Windows inc.Confirmed$45,200$22,60018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
PVC windows1lump sum$45,200$45,200

Supplier invoices

1 item $22,600
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Boisvert Windows inc.Approved2026-025318 September 2026$22,600No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

08 71 00 - Door hardware (locks, handles, closers)

Summary

Revised budget ($)
$2,400
Actual cost ($)
$1,080
Available ($)
$240
Variance ($)
-$240
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,400
Extras ($)
$0
Revised budget ($)
$2,400
Estimate package
08 71 00 - Door hardware (locks, handles, closers)

Cost code totals

Confirmed POs ($)
$2,160
Invoiced ($)
$1,080
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$1,080
Variance (%)
-10.0 %

Purchase orders

1 item $2,160
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0154 : Boisvert Windows inc.Confirmed$2,160$1,08018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Door hardware (locks, handles, closers)1lump sum$2,160$2,160

Supplier invoices

1 item $1,080
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Boisvert Windows inc.Approved2026-025418 September 2026$1,080No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

09 22 16 - Furring and metal studs for drywall

Summary

Revised budget ($)
$3,100
Actual cost ($)
$2,750
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$3,100
Extras ($)
$0
Revised budget ($)
$3,100
Estimate package
09 22 16 - Furring and metal studs for drywall

Cost code totals

Confirmed POs ($)
$1,980
Invoiced ($)
$1,980
Labour ($)
$650
Materials ($)
$120
Actual cost ($)
$2,750
Variance (%)
-11.3 %

Purchase orders

1 item $1,980
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0155 : Nordic FinishingConfirmed$1,980$1,98018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Furring and metal studs for drywall1lump sum$1,980$1,980

Supplier invoices

1 item $1,980
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Nordic FinishingApproved2026-025518 September 2026$1,980No file

Site hours

2 items $650
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberFurring and metal studs for drywallApproved8 h$520
Jean Tremblay - 7 SeptemberFurring and metal studs for drywallApproved2 h$130

Materials

1 item $120
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Furring and metal studs for drywall1lot$120$120

Budget 26-0030 : Blackbird Hill Inn inc.

09 29 00 - Drywall installation

Summary

Revised budget ($)
$12,800
Actual cost ($)
$6,460
Available ($)
$2,040
Variance ($)
-$2,040
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$12,800
Extras ($)
$0
Revised budget ($)
$12,800
Estimate package
09 29 00 - Drywall installation

Cost code totals

Confirmed POs ($)
$8,600
Invoiced ($)
$4,300
Labour ($)
$1,820
Materials ($)
$340
Actual cost ($)
$6,460
Variance (%)
-15.9 %

Purchase orders

1 item $8,600
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0156 : Nordic FinishingConfirmed$8,600$4,30018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Drywall installation1lump sum$8,600$8,600

Supplier invoices

1 item $4,300
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Nordic FinishingApproved2026-025618 September 2026$4,300No file

Site hours

4 items $1,820
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberDrywall installationApproved8 h$520
Jean Tremblay - 7 SeptemberDrywall installationApproved8 h$520
Pierre Bouchard - 7 SeptemberDrywall installationApproved8 h$520
Marc Lavoie - 8 SeptemberDrywall installationApproved4 h$260

Materials

1 item $340
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : Drywall installation1lot$340$340

Budget 26-0030 : Blackbird Hill Inn inc.

09 29 10 - Drywall taping and sanding

Summary

Revised budget ($)
$4,200
Actual cost ($)
$0
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,200
Extras ($)
$0
Revised budget ($)
$4,200
Estimate package
09 29 10 - Drywall taping and sanding

Cost code totals

Confirmed POs ($)
$3,850
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-8.3 %

Purchase orders

1 item $3,850
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0157 : Nordic FinishingConfirmed$3,850$018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Drywall taping and sanding1lump sum$3,850$3,850

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

09 30 13 - Floor tile

Summary

Revised budget ($)
$6,800
Actual cost ($)
$1,260
Available ($)
$2,600
Variance ($)
-$2,600
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$6,800
Extras ($)
$0
Revised budget ($)
$6,800
Estimate package
09 30 13 - Floor tile

Cost code totals

Confirmed POs ($)
$4,200
Invoiced ($)
$1,260
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$1,260
Variance (%)
-38.2 %

Purchase orders

1 item $4,200
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0158 : Nordic FinishingConfirmed$4,200$1,26018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Floor tile1lump sum$4,200$4,200

Supplier invoices

1 item $1,260
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Nordic FinishingApproved2026-025818 September 2026$1,260No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

09 65 19 - Vinyl flooring (planks and tiles)

Summary

Revised budget ($)
$9,900
Actual cost ($)
$2,490
Available ($)
$1,600
Variance ($)
-$1,600
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$9,900
Extras ($)
$0
Revised budget ($)
$9,900
Estimate package
09 65 19 - Vinyl flooring (planks and tiles)

Cost code totals

Confirmed POs ($)
$8,300
Invoiced ($)
$2,490
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,490
Variance (%)
-16.2 %

Purchase orders

1 item $8,300
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0159 : Nordic FinishingConfirmed$8,300$2,49018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Vinyl flooring (planks and tiles)1lump sum$8,300$8,300

Supplier invoices

1 item $2,490
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Nordic FinishingApproved2026-025918 September 2026$2,490No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

09 91 23 - Interior painting

Summary

Revised budget ($)
$7,800
Actual cost ($)
$0
Available ($)
$350
Variance ($)
-$350
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$7,800
Extras ($)
$0
Revised budget ($)
$7,800
Estimate package
09 91 23 - Interior painting

Cost code totals

Confirmed POs ($)
$7,450
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-4.5 %

Purchase orders

1 item $7,450
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0160 : Nordic FinishingConfirmed$7,450$018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Interior painting1lump sum$7,450$7,450

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

10 28 13 - Bathroom accessories

Summary

Revised budget ($)
$1,900
Actual cost ($)
$0
Available ($)
$1,900
Variance ($)
-$1,900
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$1,900
Extras ($)
$0
Revised budget ($)
$1,900
Estimate package
10 28 13 - Bathroom accessories

Cost code totals

Confirmed POs ($)
$0
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-100.0 %

Purchase orders

0 items $0
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
No linked item.

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

22 05 00 - Plumbing: general work and connections

Summary

Revised budget ($)
$25,000
Actual cost ($)
$10,100
Available ($)
$900
Variance ($)
-$900
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$25,000
Extras ($)
$0
Revised budget ($)
$25,000
Estimate package
22 05 00 - Plumbing: general work and connections

Cost code totals

Confirmed POs ($)
$24,100
Invoiced ($)
$10,100
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$10,100
Variance (%)
-3.6 %

Purchase orders

1 item $24,100
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0162 : Laurentian PlumbingConfirmed$24,100$10,10018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Plumbing: general work and connections1lump sum$24,100$24,100

Supplier invoices

1 item $10,100
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian PlumbingApproved2026-026218 September 2026$10,100No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

22 41 00 - Plumbing fixtures (toilets, sinks, tubs, showers)

Summary

Revised budget ($)
$6,200
Actual cost ($)
$1,752
Available ($)
$360
Variance ($)
-$360
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$6,200
Extras ($)
$0
Revised budget ($)
$6,200
Estimate package
22 41 00 - Plumbing fixtures (toilets, sinks, tubs, showers)

Cost code totals

Confirmed POs ($)
$5,840
Invoiced ($)
$1,752
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$1,752
Variance (%)
-5.8 %

Purchase orders

1 item $5,840
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0163 : Laurentian PlumbingConfirmed$5,840$1,75218 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Plumbing fixtures (toilets, sinks, tubs, showers)1lump sum$5,840$5,840

Supplier invoices

1 item $1,752
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian PlumbingApproved2026-026318 September 2026$1,752No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

23 05 00 - HVAC: general work

Summary

Revised budget ($)
$14,500
Actual cost ($)
$0
Available ($)
$600
Variance ($)
-$600
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$14,500
Extras ($)
$0
Revised budget ($)
$14,500
Estimate package
23 05 00 - HVAC: general work

Cost code totals

Confirmed POs ($)
$13,900
Invoiced ($)
$0
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$0
Variance (%)
-4.1 %

Purchase orders

1 item $13,900
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0164 : North River HVACConfirmed$13,900$018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
HVAC: general work1lump sum$13,900$13,900

Supplier invoices

0 items $0
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
No linked item.

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

23 31 13 - Ventilation ducts (sheet metal)

Summary

Revised budget ($)
$9,700
Actual cost ($)
$2,835
Available ($)
$250
Variance ($)
-$250
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$9,700
Extras ($)
$0
Revised budget ($)
$9,700
Estimate package
23 31 13 - Ventilation ducts (sheet metal)

Cost code totals

Confirmed POs ($)
$9,450
Invoiced ($)
$2,835
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$2,835
Variance (%)
-2.6 %

Purchase orders

1 item $9,450
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0165 : North River HVACConfirmed$9,450$2,83518 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Ventilation ducts (sheet metal)1lump sum$9,450$9,450

Supplier invoices

1 item $2,835
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
North River HVACApproved2026-026518 September 2026$2,835No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

26 05 00 - Electrical: general work and service entrance

Summary

Revised budget ($)
$32,000
Actual cost ($)
$12,360
Available ($)
$1,100
Variance ($)
-$1,100
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$32,000
Extras ($)
$0
Revised budget ($)
$32,000
Estimate package
26 05 00 - Electrical: general work and service entrance

Cost code totals

Confirmed POs ($)
$30,900
Invoiced ($)
$12,360
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$12,360
Variance (%)
-3.4 %

Purchase orders

1 item $30,900
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0166 : Laurentian ElectricalConfirmed$30,900$12,36018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Electrical: general work and service entrance1lump sum$30,900$30,900

Supplier invoices

1 item $12,360
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian ElectricalApproved2026-026618 September 2026$12,360No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

26 51 00 - Interior lighting (recessed, pendant, LED)

Summary

Revised budget ($)
$4,500
Actual cost ($)
$1,260
Available ($)
$300
Variance ($)
-$300
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,500
Extras ($)
$0
Revised budget ($)
$4,500
Estimate package
26 51 00 - Interior lighting (recessed, pendant, LED)

Cost code totals

Confirmed POs ($)
$4,200
Invoiced ($)
$1,260
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$1,260
Variance (%)
-6.7 %

Purchase orders

1 item $4,200
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0167 : Laurentian ElectricalConfirmed$4,200$1,26018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Interior lighting (recessed, pendant, LED)1lump sum$4,200$4,200

Supplier invoices

1 item $1,260
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Laurentian ElectricalApproved2026-026718 September 2026$1,260No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

31 23 16 - Foundation excavation

Summary

Revised budget ($)
$4,500
Actual cost ($)
$4,250
Available ($)
$250
Variance ($)
-$250
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$4,500
Extras ($)
$0
Revised budget ($)
$4,500
Estimate package
31 23 16 - Foundation excavation

Cost code totals

Confirmed POs ($)
$4,250
Invoiced ($)
$4,250
Labour ($)
$0
Materials ($)
$0
Actual cost ($)
$4,250
Variance (%)
-5.6 %

Purchase orders

1 item $4,250
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0168 : Northern ExcavationConfirmed$4,250$4,25018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
Foundation excavation1lump sum$4,250$4,250

Supplier invoices

1 item $4,250
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Northern ExcavationApproved2026-026818 September 2026$4,250No file

Site hours

0 items $0
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
No linked item.

Materials

0 items $0
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
No linked item.

Budget 26-0030 : Blackbird Hill Inn inc.

33 46 13 - French drain and foundation drainage

Summary

Revised budget ($)
$2,800
Actual cost ($)
$2,720
Available ($)
$80
Variance ($)
-$80
Project
26-0030 : Blackbird Hill Inn inc.
Project manager
MD

Adjust budget

Selected bid price ($)
Internal estimate ($)
Budget ($)
$2,800
Extras ($)
$0
Revised budget ($)
$2,800
Estimate package
33 46 13 - French drain and foundation drainage

Cost code totals

Confirmed POs ($)
$2,350
Invoiced ($)
$2,350
Labour ($)
$260
Materials ($)
$110
Actual cost ($)
$2,720
Variance (%)
-2.9 %

Purchase orders

1 item $2,350
Purchase orders
Purchase orderStatus🤖 PO total ($)🤖 Accounts payable ($)🤖 PO confirmed date🤖 Confirmed PO PDF
BC-26-0169 : Northern ExcavationConfirmed$2,350$2,35018 Aug. 2026No file
1 subitem
Purchase order lines
Order lineQuantityUnitUnit price ($)🤖 Subtotal ($)
French drain and foundation drainage1lump sum$2,350$2,350

Supplier invoices

1 item $2,350
Supplier invoices
Supplier invoicePayable status🤖 # Invoice🤖 Invoice date🤖 Subtotal ($)✏️ Invoice PDF
Northern ExcavationApproved2026-026918 September 2026$2,350No file

Site hours

1 item $260
Site hours
Time entry✏️ Work descriptionStatus🤖 Hours worked (calculated)🤖 Employee cost ($)
Marc Lavoie - 7 SeptemberFrench drain and foundation drainageApproved4 h$260

Materials

1 item $110
Materials
Material✏️ Quantity🤖 Unit🤖 Unit cost ($)🤖 Cost ($)
Supplies : French drain and foundation drainage1lot$110$110